Our Project implementation team

The Promoter’s extensive knowledge and contacts in the field has helped to create several teams to take care of all the different functions of the project in the best possible manner.

1. The machinery sourcing team.

  • The project’s main machinery has been sourced from overseas manufacturers. Machinery manufacturers from all around the world were evaluated and a European based supplier was finally decided upon. Experienced persons who have worked many years in this field and familiar with installations of such machinery in many parts of the world were consulted before reaching at the decision.

  • Apart from this, the locally manufactured machinery must coordinate with the imported machinery to a high degree to achieve the optimum operation flow. Several suppliers within the country were consulted. A set of well experienced vendors who are familiar with each other have been selected for the supply and installation of these machinery.

2. The project implementation team.

  • The project’s main machinery has been sourced from overseas manufacturers. Machinery manufacturers from all around the world were evaluated and a European based supplier was finally decided upon. Experienced persons who have worked many years in this field and familiar with installations of such machinery in many parts of the world were consulted before reaching at the decision.

  • Apart from this, the locally manufactured machinery must coordinate with the imported machinery to a high degree to achieve the optimum operation flow. Several suppliers within the country were consulted. A set of well experienced vendors who are familiar with each other have been selected for the supply and installation of these machinery.

3. The manpower sourcing team.

  • Manpower is critical for the project because of the high skill level required. Since this is the first project of its kind in the state, the quality of the manpower who can be trained quickly to absorb the necessary skills is critical apart from loyalty to the company. Hence special care is taken to select the right type of workers for the project. We have some of the most experienced personnel who have worked in similar plants in our team. The promoter will be personally in charge of this team.

4. The refrigeration system, Sensor system and Monitoring system team.

  • The project requires a unique refrigeration system with around 2000 sensor fitted cool boxes, 10000 PCM pads and blast freezers to function properly. There will be around 2000 sensors and devices in the system. Every transport vehicle will also have vapour sensors and the factory building and critical equipments also will be fitted with sensors. These sensors will be continuously sending data to a centralised monitoring facility for process control operations. Hence very experienced consultants and vendors were selected from the industry to implement the system.

5. The pollution control system team.

  • Usually, Pollution control systems are implemented to barely meet the minimum regulatory requirements of the Government. However, we have decided upon a well-considered design for this project after consultation with some of the best operators in this field for its efficacy and suitability in the local scenario. The plant will have airtight processing rooms, maintaining negative pressure to avoid leakage of pollutants into neighbourhood, high air circulation cycles to ensure proper working condition in the facility.
06-03
05-01
05-02

6. The solar power team.

  • The Solar plant is a great advantage for the project because of the electricity consumption is high. An experienced team of professionals have been selected for the design and implementation of the system including the coordination with the KSEB for the uploading and downloading of the power generated.
08-01

7. The electric vehicle system team.

  • Electric Vehicles will make the raw material transport very economical giving significant advantage strategically. Moreover, it will be great image creator for the company and will give a great brand image.
09-01

8. The forward integration project team.

  • There are many forward integration projects like fish feed and pig feed manufacturing which are ideally suitable for this project and will give much strategic advantages in the long run. We have already completed such studies and discussions with world leaders in the field and are ready for implementation once this project takes off.
    Much observation, study, work, travel in India and overseas have been undertaken to conclude all these preparations and negotiations. The promoter has spent considerable amount of funds, time and energy over the last few years to finalise the design and sourcing for the project. All the necessary foundational work has been completed and we have a holistic approach to this project and are well prepared to make this project a success.
10-01